Jump to the main content block

 

Lee, Shine-Der Professor

Personal Profile
李賢得Lee, Shine-Der
Job title
Professor
  • 53146
  • 61318
Personal Web
 
 
Information

Logistic Management、Operations Research、Production/Inventory Models、Manufacturing System


學校名稱 國別 系所 學位 起迄年月
喬治亞理工科技大學 美國 工業工程 博士 7609 ~ 8108
奧克拉荷馬州立大學 美國 工業工程 碩士 7308 ~ 7506
國立成功大學 中華民國 造船工程學系 學士 6409 ~ 6806

 


服務機關 職稱 起迄年月
國立成功大學 教授 890801 ~ 迄今
國立成功大學 副教授 810801 ~ 890731
台電公司 機械工程師 701012 ~ 730801

 

Research

學年度 著作 著作人
2016 Lee, Shine-Der; Yang, Chin-Ming; Lan, Shu-Chuan,2016,Economic lot sizing in a production system with random demand,INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE; INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE,47(5),pp1142-1154 (SCI) 李賢得
2014 *Lee, S.-D.,; Fu, Y.-C. (研究生),,2014,Joint Production and Delivery Lot Sizing for a Make-to-order Producer-buyer Supply Chain with Transportation Cost,Transportation Research Part E: Logistics and Transportation Review;,66,pp23-35 (SCI) 李賢得
2014 *Lee, S.-D.,; Lan, S.-C., (研究生),; Yang, C.-M. (研究生),,2014,Economic Production Lot Sizing Model with Stochastic Demand,Asia Pacific Journal of Operational Research; Asia Pacific Journal of Operational Research,31,3,pp1-23 (SCI) 李賢得
2014 *Lee, S.-D.,; Yang, C.-M. (研究生),; Lan, S.-C. (研究生),,2014,Economic Lot Sizing in a Production System with Random Demand,International Journal of System Science;,pp1-12 (SCI) 李賢得
2013 *Lee, S.-D.,; Fu, Y.-C. (研究生),,2013,Joint Production and Shipment Lot Sizing for Delivery Price-based Production Facility,International Journal of Production Research;,51,20,pp6152-6162 (SCI) 李賢得
2013 *Lee, S.-D; Lan, S.-C., (研究生),,2013,Production Lot Sizing with a Secondary Outsourcing Facility,International Journal of Production Economics;,141,1,pp414-424 (SCI) 李賢得
2013 *Lee, S.-D.,; Yang, C.-M. (研究生),,2013,An Economic Production Quantity Model with a Positive Resetup Point under Random Demand,Applied Mathematical Modeling,;,37,5,pp3340-3354 (SCI) 李賢得
2008 *Lee S.-D.; Kuo Y.-C.,2008,

Exact and Inexact Solution Procedures for the Order Picking in an Automated Carousal Conveyor

,International Journal of Production Research;,46,16,pp4619-4636 (SCI)
李賢得
2007 *Lee, S.-D.,; Chang, W.-T. (研究生),,2007,On Solving the Discrete Location Problems When the Facilities are Prone to Failure,Applied Mathematical Modeling;,31,5,pp817-831 (SCI) 李賢得
2004 Chiang C.-P.; Lee S.-D.,2004,

A Genetic-based Algorithm with the Optimal Partition Approach for the Cell Formation in bi-directional Linear Flow Layout

,International Journal of Computer Integrated Manufacturing,17,4,pp364-375 (SCI)
李賢得
2004 Chiang C.-P.; Lee S.-D.,2004,

Joint Determination of Machine Cells and Linear Intercell Layout

,Computers and Operations Research,31,4,pp1603-1619 (SCI)
李賢得
2002 *Lee S.-D.; Chiang C.-P.,2002,

Cell Formations in the Uni-directional Material Handling Environment

,European Journal of Operational Research,137,2,pp401-420 (SCI)
李賢得
2002 *Lee S.-D.; Ho S.-H.,2002,

Buffer Sizing in Manufacturing Production Systems with Complex Routings

,International Journal of Computer Integrated Manufacturing,15,2,pp440-452 (SCI)
李賢得
2001 *Lee S.-D.,2001,

On Solving Unreliable Planar Location Problems

,Computers and Operations Research,28,4,pp329-344 (SCI)
李賢得
2001 *Lee S.-D.; Huang K.-S. ; Chiang C.-P.,2001,

Configuring Layout in the Uni-directional Loop Material Handling Environment

,International Journal of Production Research,39,6,pp1183-1201 (SCI)
李賢得
2001 *Lee S.-D.; Chiang C.-P.,2001,

A Cut-tree Based Approach for Clustering Machine Cells in the Bi-directional Linear Flow Layout

,Internationl Journal of Production Research,39,15,pp3491-3512 (SCI)
李賢得
2000 *Lee S.-D.; Rung J. –M.,2000,

Production Lot Sizing in Failure Prone Two-stage Serial Systems

,European Journal of Operational Research,123,1,pp42-60 (SCI)
李賢得
2000 *Lee S.-D.,2000,

Buffer Sizing in Complex Cellular Manufacturing Systems

,International Journal of Systems Science,31,8,pp937-948 (SCI)
李賢得
1998 *Lee S.-D.,1998,

Configuring Layout for a Cellular Manufacturing System

,International Journal of Systems Science,29,6,pp557-564 (SCI)
李賢得
1997 *Lee S.-D.; Chen Y.-L.,1997,

A Weighted Approach for Cellular Manufacturing System Design: Minimizing Intercell Movement and Balancing Workload Among Indentical Machines

,International Journal of Production Research,43,4,pp1125-1146 (SCI)
李賢得

 


學年度 著作 著作人
2014 *Lee, S.-D.,,2014,A Cut Approach for Solving the Single-Row Machine Layout Problem,2014 Annual meeting of the Society of Industrial and Applied mathematics (SIAM),;,Chicago, IL, USA, 李賢得
2011 *Lee, S.-D.,; Fu, Y.-C.,,2011,An Extended Economic Production Quantity Model with Periodic Delivery,7th International Congress on Industrial and Applied mathematics (ICIAM),;,Vancouver, Canada, 李賢得
2010 *Lee, S. D.; Lan, S.-C.,; Yang, C.-M.,,2010,Production Lot Sizing with a Secondary Outsourcing Facility.,2010 Annual meeting of the Society of Industrial and Applied mathematics (SIAM).;, 李賢得
2009 *Lee, S.-D.,,2009,Economic production lot sizing model with stochastic demand,OR 51, The Operational Research Society annual conference (UK),;,University of Warwick, UK, 李賢得
2008 *Lee, S.-D.,2008,Optimal pricing and procurement quantity for an item on sale under stochastic demand,56th Anniversary and Annual meeting of the Society of Industrial and Applied mathematics;,San Diego, CA, USA, 李賢得
2008 Lee, S. D.,2008,Optimal pricing and procurement quantity for an item on sale under stochastic demand.,56th Anniversary and Annual meeting of the Society of Industrial and Applied mathematics (SIAM).;, 李賢得
2007 Lee, S.-D.,2007,Joint determination of optimal price and procurement quantity for an item on sale when the demand is probabilistic.,The 13th Asia Pacific Management Conference (APMC).;, 李賢得
2006 *Lee S.-D.,2006,

Dynamic matching in the TFT-LCD display cell assembly process

,Boston, MA, USA,
李賢得
2006 *Lee S.-D.,2006,

Dynamic yield management in the TFT-LCD display cell assembly process

,Bangkok, Thailand,
李賢得
2006 *Young C.-M.; Lee S.-D.,2006,

Stock location model for a multi-floor warehouse with adjacency constraint

,Taichung, Taiwan,
李賢得
2006 *Dong C.-Y.; Lee S.-D.,2006,

Economical production lot sizing in two-stage serial production systems with rework

,Taichung, Taiwan,
李賢得
2005 *Lee S.-D.,2005,

Sequencing and Batching Control in a Carousal Order Picking System. CP19-Applied mathematics, Society of Industrial and Applied Mathematics

,New Orleans, LA, USA,
李賢得
2004 *藍淑娟;李賢得,2004,

Optimal Spare Levels for Two-echelon Decentralized Repairable Inventory System with Fixed Replenishment Time

,台南,
李賢得
2004 *楊欽閔;李賢得,2004,

考慮相鄰儲位限制下專用儲位倉儲系統最佳佈置設計

,台南,
李賢得
2002 *Lee S.-D.,2002,

On Solving the Unreliable Discrete Location Problems

,Philadelphia, Pennsylvania, U.S.A,
李賢得
1999 *Lee S.-D.,1999,

Optimal Procurement Quantities for an Item on Sale with Temporary Price Discount When the demand is Probabilistic

,New Orleans, Louisiana, U.S.A,
李賢得

 


學年度 專書類別 出版日期 專書名稱 著作人
2009 (專書) 2009/00/00 Lee, S.-D.; Chien, S.-H.,Optimal Procurement Quantity and Sale Price for an Item on Sale When the Demand is Probabilistic,2009/00 李賢得
2008 (專書) 2008/00/00 Lee, S.-D.; Dong, C.-Y.,Production Lot Sizing in Two-stage Imperfect Serial Systems with Reworks,2008/00 李賢得
2007 (專書) 2007/00/00 Lee, S.-D.; Yung, C.-M.,A Generalized Assignment Approach for the Storage Layout Problems with contiguous requirement,2007/00 李賢得
2001 (專書) 2001/00/00 李賢得; 陳春益; 呂錦山; 林立千,高雄港企業診斷-物流中心營運管理及設施規劃之研究,2001/00 李賢得

 


年度 計畫名稱 參與人 計畫時間
2017 線性物料搬運環境中機器具等間距與變動間距之生產設施佈置網路模式與圖形論求解方法發展   2017/08/01 ~ 
2018/07/31
2016 線性物料搬運環境中機器具等間距與變動間距之生產設施佈置網路模式與圖形論求解方法發展   2016/08/01 ~ 
2017/07/31
2015 線性物料搬運環境中機器具等間距與變動間距之生產設施佈置網路模式與圖形論求解方法發展   2015/08/01 ~ 
2016/07/31
2014 二階供應鏈動態生產與配送批量聯合決策模式與求解方法   2014/08/01 ~ 
2015/07/31
2013 訂貨後生產型二階供應鏈最佳生產與配送批量聯合決策模式與求解方法   2013/08/01 ~ 
2014/07/31
2011 最佳經濟生產批量與配送批量聯合決策模式與求解方法發展   2011/08/01 ~ 
2012/07/31
2010 在單向單迴圈環境中具重複機器類型與產能限制之佈置模式與解法發展   2010/08/01 ~ 
2011/07/31
2009 在單向單迴圈環境中具重複機器類型與產能限制之佈置模式與解法發展   2009/08/01 ~ 
2010/07/31
2008 在單向單迴圈環境中具重複機器類型與產能限制之佈置模式與解法發展   2008/08/01 ~ 
2009/07/31
2007 在隨機需求下之經濟生產批量模式發展   2007/08/01 ~ 
2008/07/31
2006 在隨機需求下之經濟生產批量模式發展   2006/08/01 ~ 
2007/07/31
2005 TFT-LCD 面板組裝之最佳動態配對模式-考慮不同切割方式與暫存區限制   2005/08/01 ~ 
2006/08/31
2004 兩階段生產系統具瑕疵品與重製工作之最佳生產經濟批量模式   2004/08/01 ~ 
2005/08/31
2003 特價商品在隨機需求下之最佳售價與訂購量共同決策模式   2003/08/01 ~ 
2004/09/30
2002 兩階層配銷系統 (訂購點,固定訂購量) 存貨政策模式發展   2002/08/01 ~ 
2003/07/31
2001 封閉式物料旋轉料架之訂單檢貨問題探討   2001/08/01 ~ 
2002/07/31
2000 封閉式物料搬運迴圈下之設施佈置問題探討   2000/08/01 ~ 
2001/07/31
1999 兩階層備用零件(S-1,S)庫存系統之研究   1999/08/01 ~ 
2000/07/31
1998 數量管理方法與應用-台灣之成功經驗研討會   1998/10/01 ~ 
1999/03/31
1998 動態型﹝訂購點,最高庫存水準﹞最佳庫存模式之發展   1998/08/01 ~ 
1999/07/31
1997 不可靠離散型設施最佳定址模式之研究   1997/08/01 ~ 
1998/07/31
1996 不可靠兩階段生產系統最佳經濟批量模式研究   1996/08/01 ~ 
1997/07/31
1995 不可靠設施、設備之最佳位置選擇研究   1995/08/01 ~ 
1996/07/31